Popular Designs >
Whiteboards by Industry >
Contractor Whiteboards >
Construction Job Scheduling Whiteboard
Construction Job Scheduling Whiteboard
Track each phase of your construction project to maintain deadlines and stay on schedule
Construction Job Scheduling Whiteboard
Track each phase of your construction project to maintain deadlines and stay on schedule
- Streamline Your Construction Project
- Optimize project scheduling to prevent delays and maintain workflow efficiency.
- Easily identify potential time conflicts and assign clear responsibilities for each project phase.
- Customizable Layout
- Rows and columns can be adapted to fit the number of project phases and timeframes specific to your industry needs
Sizes & Pricing
Step 1:Select Part # to Continue
Step 1:Select Option to Continue
* Price includes a Supply Kit of useful accessories
Additional InformationDetailed Description Tech Specs Options Customer Comments:
- Whiteboard Structure
- The first two columns display project phases on colored magnets along with contractor details
- The remaining columns track the project timeline detailing progress in weeks, months, milestones or due dates
- Adaptable Whiteboard Size
- Choose a whiteboard size based on the amount of dates needed to track and the amount of info needed in each cell
- Free Supply Kit
- 20 Damp-Erase Magnets
- 4" wide to fit row height
- Comes in 4 colors:
- 5 Yellow (6 for a 4x6' whiteboard)
- 5 Orange
- 5 Ivory
- 5 Silver
- Black Damp-Erase Marking Pen
- 4 Fine Point Dry-Erase Markers
- Magnetic Eraser
- Hanging Hardware
- 20 Damp-Erase Magnets
- Polymer Fusion Process™
- Heat-fused whiteboard design and colored graphics for a highly durable, magnetic surface.
- Durable Construction
- Three-layer construction, moisture-resistant, and guaranteed not to stain, fade, shadow, or crack.
- For indoor use. Class C Fire Rated.
- Service temperature range = -10F to +160F
- Whiteboard Frame
- Choose from Aluminum or Wood Frame (Natural Oak, Walnut, Cherry, or Black)
- Whiteboard Accessories
- Complete your whiteboard creation with our selection of Whiteboard Supplies & Magnetic Accessories.
- Additional Customization
- For a rolling whiteboard style or additional custom size/design options, contact Customer Service for a quote.
Our Review of Your Design
- Upload Your File
- Send your file to us in any of the following ways:
- Review Your Design
- Our in-house creative designer will create a PDF proof of your design and work with you from start to finish.
- Final Approval
- We DO NOT print anything until we receive your approval of the design proof.
Suggested Products:
Sizes & Pricing
Step 2:Select Part # to continue
| Board Size H' x W' | 2' x 3' |
| # of Columns (dates) | 10 |
| Row H" (# of phases) | 1" H (19) |
| Ships Via | UPS |
| Board with Kit | |
| Part # | 38CA350 |
| Price/Ea | $379.26 |
| Board Size H' x W' | 3' x 4' |
| # of Columns (dates) | 14 |
| Row H" (# of phases) | 1-1/2" H (20) |
| Ships Via | UPS |
| Board with Kit | |
| Part # | 38CA570 |
| Price/Ea | $632.96 |
| Board Size H' x W' | 4' x 6' |
| # of Columns (dates) | 22 |
| Row H" (# of phases) | 2" H (21) |
| Ships Via | Truck |
| Board with Kit | |
| Part # | 38CA790 |
| Price/Ea | $1,102.31 |






Break-Apart Magnets
Crew and Equipment Control Whiteboards
Magnetic Marker Tray
Project Control Whiteboard Kit