Project Control Whiteboard Kit
Communicate project status and timelines at a glance
Project Control Whiteboard Kit
Communicate project status and timelines at a glance
- Visualize Your Project Timeline
- Track every project step from start to finish.
- Quickly identify potential conflicts before they occur.
- Easy Schedule Management
- Update project timelines by simply moving the magnetic strips as schedules change.
Sizes & Pricing
Additional InformationDetailed Description Tech Specs Options Customer Comments:
- Whiteboard Setup
- Label project steps in the left column and cut the multi-colored magnetic strips to the appropriate length.
- Flexible Timeline Display
- Choose your preferred time scale based on project duration.
- Vertically accommodate up to 80 distinct project steps.
- Free Supply Kit
- Magnetic Month (JAN-DEC) & Date (1-31) Sets
- Adhesive Letter Sets - 1/4", 1" black
- 1"x6" Write-on Wipe-off Magnets - white
- Magnetic Ribbon rolls - 6 assorted colors
- Magnet Marking Pens
- Whiteboard Cleaner
- Magnetic Marker Tray
- Hanging Hardware
- Polymer Fusion™ Process
- Heat-fused whiteboard design and colored graphics for a highly durable, magnetic surface.
- Durable Construction
- Three-layer construction, moisture-resistant, and guaranteed not to stain, fade, shadow, or crack.
- For indoor use. Class C Fire Rated.
- Whiteboard Accessories
- Lining tape, letter/number sets, markers - see our Whiteboard Supplies
- Magnetic indicators, dates, card holders, clips - see our Magnetic Accessories
- Additional Magnetic Strips
- Extra magnetic strips - 3/8"x10' size
- Custom Designs
- Custom sizes, graphics, and designs available to meet your specific project needs
- Contact Customer Service for a quote
- Oversized Boards
- We can manufacture whiteboards longer than the standard 8' to meet your unique needs
- Contact Customer Service for more details
Our Review of Your Design
- Upload Your File
- Send your file to us in any of the following ways:
- Review Your Design
- Our in-house creative designer will create a PDF proof of your design and work with you from start to finish.
- Final Approval
- We DO NOT print anything until we receive your approval of the design proof
Suggested Products:
Sizes & Pricing
Step 2:Select Part # to continue
| Board Size H' x W' | 4' x 6' |
| Magnetic Strip L' | 200' |
| Ships Via | Truck |
| Board with Kit | |
| Part # | 48790 |
| Price/Ea | $1,191.10 |






Daily Job Schedule Lift-Out Whiteboards
Daily Leave Schedule Whiteboards
Damp-Erase Magnet Marking Pens
Job Status Whiteboard